Building with containers
Master Container is a modified container manufacturer that brings engineering, fabrication, and after-sales service together under one roof — delivering buildings that are fast, sturdy, and ready to use.
Our story
From a small workshop to a national project partner
We started out modifying containers for local contractors who needed project offices that were quick to set up and fit for purpose. Today we serve construction and mining companies, government agencies, F&B businesses, and tourism developers across Indonesia.
We believe container buildings are more than a temporary solution. With the right design and the right materials, a container can become a comfortable office, an iconic café, or a memorable villa — built in weeks, not months.
Our values
How we work
Engineering first
Every design is calculated by our engineering team — structure, electrical systems, and air circulation — before it goes into production.
Our own workshop
Production takes place in our own workshop, so quality, schedules, and costs stay under control.
Strict quality control
Leak tests, electrical tests, and finishing inspections on every unit before it ships.
Transparent
Clear pricing, specifications, and schedules from the start — no hidden costs.
Warranty
A written warranty for every unit
Every unit is handed over after a function test with you, complete with warranty documents.
- 1-year structural warranty
Container frame, walls, floor and roof.
- 6-month installation warranty
Electrical, plumbing, doors and windows.
- Function test at handover
We inspect the unit with you, then hand over the warranty documents.
Work process
From idea to handover
- 01
Consultation & survey
We get to know your needs, site, and budget. A site survey is carried out if needed.
- 02
Design & quote
2D/3D working drawings, material specifications, a schedule, and a detailed cost estimate.
- 03
Workshop production
Cutting, frame welding, insulation, electrical work, plumbing, and interior finishing.
- 04
Quality control
A 40+ point QC checklist: structure, leaks, electrical, paint, and completeness.
- 05
Delivery & handover
Delivery, installation, functional testing with the client, and warranty documents.
Delivery process
From our depot to your site
Scroll slowly to follow the container’s journey, from the depot loading area to being set down at the project site.
01Step 1
Container ready at the depot
Your container is prepared in the loading area of our depot.
02Step 2
Loading by forklift
A forklift lifts the container onto the trailer, then the twist locks are secured so it travels safely.
03Step 3
Delivery to your site
The trailer truck carries the container from the depot to the project site.
04Step 4
Unloading on site
The twist locks are released, then the forklift sets the container down right at the placement point.
Workshop capabilities
Everything done in-house
Our workshop in Cillincing is equipped with fabrication equipment and specialist teams for every stage of the work.
- Cutting & welding (CNC plasma, MIG/MAG)
- Sandblasting & epoxy/PU painting
- Glasswool & rockwool insulation
- Electrical & plumbing installation
- Interiors: HPL, gypsum, vinyl, kitchen cabinets
- 3D design & working drawings
- Transport by truck, crane & ship
- Maintenance & after-sales
Legal & licensing
PT Malaka Jaya Abadi
- Workshop address
- Jl. Rorotan-Marunda No.14, Cillincing, West Java
- Opening hours
- Mon–Sat, 08:00–17:00 WIB
- Service area
- All of Indonesia
- Documents
- NIB, NPWP, SIUP — available for vendor registration